The student has to be able to comprise the structure of work of team like fundamental part of the integrated direction of projects. |
|
|
C8
|
D3 D5
|
The student has to be able to define, comprise and identify the processes of follow-up and control of the project. |
|
|
C2 C3
|
D1 D2
|
El estudiante debe ser capaz de desarrollar y utilizar los medios como director del proyecto para el control y seguimiento del proyecto:(error in msg parsing:
XML error parsing SOAP payload on line 2: Invalid character:http://tradutorsw.uvigo.es/trad-docx/web/translate-string.php?wsdl) |
|
|
C5 C6 C9 C10 C11
|
D3 D5
|
The student has to be able to develop tools of follow-up and control.
|
|
|
C4 C5
|
D3 D4
|